Network Proposal Executive Summary
Important notes about the Executive Summary:
• The Executive Summary is presented first because it provides the reader with an overview of the complete proposal. The proposal will be read by people with different roles and requirements. These may include managers; network engineers and technicians; marketing and sales consultants; and finance and accounting personnel. By reviewing the Executive Summary first, readers can then decide whether to read through the complete document or read only those sections that apply to their role.
• Although presented first, the Executive Summary cannot be written until the rest of the proposal document has been compiled. This section is therefore the final section to be written.
Layout of the Network Architecture Proposal
The proposal layout should be highly readable and aid the reader in locating information. Graphics enhance the readability of a proposal and convey information as well. Text should be legible, typically a serif typeface such as Times Roman, at 10-point to 12-point type. Page margins should be at least 0.5 inches, and page numbers should be included at the top or bottom of each page.
Section
|
Description
|
Executive Summary
|
Discusses the project goals and project scope at a high level. This section demonstrates that the network vendor understands the extent of the project and the role of the network in meeting the business goals. The goal of the summary is to convince the decision-makers of the business benefits of the design. This section is typically one to two pages long.
|
Network Requirements
|
Reviews the business goals and network requirements, including users and applications that need to be supported. This section often lists the business goals, in order of priority, with critical goals marked. This section includes the topologies; protocols, hardware, software, and training that are required to meet the business goals.
|
Current Network Environment
|
Documents the state of the existing network. This section includes physical and logical diagrams and the IP addressing scheme. The section summarizes the results of the network characterization, including strengths and weaknesses of the existing network. It also documents the user community and applications currently in use, based on the network characterization.
|
Proposed Physical Design
|
Describes the physical layout of the proposed design. This section documents trade-offs made to accommodate business goals and technical requirements. The section describes the features and recommended uses for the technologies and devices proposed for the new network design. This section documents the new WAN service and new network equipment. The section also includes proposed network diagrams.
|
Proposed Logical Design
|
Describes the logical topology of the proposed network. This section documents any proposed addressing and naming conventions. It describes the routing and switching protocols recommended for the planned network. This section includes recommended security mechanisms and products that support the security policy of the business. The section may include information on recommended network management procedures and applications.
|
Implementation Plan
|
Provides a detailed list of the tasks that must be performed to install and implement the new network. This section includes tasks, steps, time required, and proposed schedules.
|
Cost Proposal
|
Provides cost proposal for equipment, software, installation, and ongoing support.
|
Guideline in Network Administration
Cisco Lifecycle Services
Cisco Lifecycle Services is designed to support evolving networks. Cisco Lifecycle Services is a six-phase approach to deploying and operating Cisco technologies.
The six phases of the Cisco Lifecycle Services are:
• The Preparation Phase
• The Plan Phase
• The Design Phase
• The Implement Phase
• The Operate Phase -maintenance
• The Optimize Phase -maintenance
- In the Prepare phase, the business goals of the project are identified and a business case is created to justify the installation of the network upgrade.
- During the Plan phase, the network designer performs a comprehensive site and operations assessment of the current network. A project plan is created that includes the tasks, time-lines, risks, responsibilities and the resources required to complete the network design project.
- In the Design Phase, the designer creates a flexible design that can integrate new technologies into the current operations and existing network infrastructure.
- During the Implement phase, the network is built according to the approved designs and specifications and tested to ensure it meets the business goals and requirements.
- The Operate and Optimize phases of the network lifecycle are ongoing and represent the day-to-day operations of the network. Optimizing a network is a continuous process that identifies and resolves potential weaknesses before they become problems for network operations.
The proposal typically contains the following sections:
A. Executive Summary
B. Network Requirements (planning stage)
C. Current Network Environment (planning stage)
D. Proposed Physical Design
E. Proposed Logical Design
F. Implementation Plan
G. Cost Estimate